当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:②将上述改善对策及纠正措施,列入SOP作业指引内进行管制.PQA长期进行跟进。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
②将上述改善对策及纠正措施,列入SOP作业指引内进行管制.PQA长期进行跟进。
问题补充:

  • 匿名
2013-05-23 12:21:38
② the above improvement measures and corrective measures included in the the sop operating guidelines for control. Pqa long-term follow-up.
  • 匿名
2013-05-23 12:23:18
2 will be improvements to the above measures and corrective measures to be included in the Guidelines SOP job control long-term follow-up PQA . .
  • 匿名
2013-05-23 12:24:58
②The above improvement countermeasure and the correction measure, include in the SOP work direction to carry on control .PQA to carry on for a long time follow up.
  • 匿名
2013-05-23 12:26:38
② the above improvement measures and corrective measures to control within the guidelines included in the SOP. PQA long-term follow up.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭