当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:利用高架法或悬丝法将百分表安装在桥梁下面的待测部位是什么意思?

待解决 悬赏分:1 - 离问题结束还有
利用高架法或悬丝法将百分表安装在桥梁下面的待测部位
问题补充:

  • 匿名
2013-05-23 12:21:38
Use of elevated law or hanging wire method will dial indicator installed on the bridge following test site
  • 匿名
2013-05-23 12:23:18
Take advantage of the high-rack or hanging wire act 100 will be installed in a table below the bridge of the area to be tested
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
By means of elevated bridge or suspension by the dial gauge is installed in the following test site
  • 匿名
2013-05-23 12:28:18
Install using the high structure law or the suspension fiber law the dial guage under the bridge treat measure the spot
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭