|
关注:1
2013-05-23 12:21
求翻译:设计师通过运用新式工具,改变了以往方案设计的思维方式;承建方由于得到新型的图纸信息,改变了传统的操作流程;管理者则因使用统筹信息的新技术,改变其前前后后工作日程、人事安排等一系列任务的分配方法。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
设计师通过运用新式工具,改变了以往方案设计的思维方式;承建方由于得到新型的图纸信息,改变了传统的操作流程;管理者则因使用统筹信息的新技术,改变其前前后后工作日程、人事安排等一系列任务的分配方法。
问题补充: |
|
2013-05-23 12:21:38
Through the use of new tools, the designer has changed the way of thinking of the previous design; the construction side, the new drawings, change the traditional operational processes; managers due to co-ordinate information technology, changing the Ins and Outs of work schedule the distribution of
|
|
2013-05-23 12:23:18
The designer through the use of new tools to change programs have been designed way of thinking; contractors because of the New Party's drawings, has changed the traditional operating processes; managers use the co-ordination of information technology, and change its darker side work schedule, perso
|
|
2013-05-23 12:24:58
The designer through the utilization new style tool, changed the former project design thinking mode; Because the construction only then obtains the new blueprint information, changed the traditional operation flow; Then the superintendent because of the use overall plan information new technology,
|
|
2013-05-23 12:26:38
Designers through the use of new tools, changed the way of thinking of design in the past; drawings Contracting Party because of the new information, changed the traditional procedures; for using integrated information technology manager, changed their course schedule, staffing and so on a series of
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区