求翻译:How are you? For the Phase II new production, I told that it is 45days without open bending tooling ,and 70days with open tooling, in fact, if open tooling, the production time should be 60days instead of 70days, because we can purchase the material during the time of open tooling, so we can save 10days.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
How are you? For the Phase II new production, I told that it is 45days without open bending tooling ,and 70days with open tooling, in fact, if open tooling, the production time should be 60days instead of 70days, because we can purchase the material during the time of open tooling, so we can save 10days.
问题补充:

  • 匿名
2013-05-23 12:21:38
你怎么样?二期新生产的,我告诉这是没有开放的弯曲模具45天,开放工装70天的,事实上,如果开模具,生产时间应是60天的70天而不是,因为我们可以在时间购买材料开放的工具,所以我们可以节省10天。
  • 匿名
2013-05-23 12:23:18
您是如何呢? 第二阶段的新的生产,我告诉他,这是45天,而打开折弯模具、和70天,打开取出。其实,如果打开模具、生产时间而不是应60天70天,因为我们现在可以购买这种材料的时间期间的开放工具,所以我们可以保存10天。
  • 匿名
2013-05-23 12:24:58
你好吗? 为阶段II新的生产,我告诉它是45days没有开放弯曲的凿出的装饰和70days与开放凿出的装饰,实际上,如果开放凿出的装饰,产品制造时间应该是60days而不是70days,在开放凿出的装饰期间,因为我们可以购买材料,因此我们可以保存10days。
  • 匿名
2013-05-23 12:26:38
你好吗?第二阶段新生产,我告诉它是不开放的弯曲模具装船和 70days 与打开模具,事实上,如果打开模具,生产时间应该是 60days 的 70days 而不是,因为我们可以购买材料的时间内打开模具,这样我们可以保存 10 天。
  • 匿名
2013-05-23 12:28:18
您好吗?对第 II 阶段新生产,我告诉它是无使用工
 
 