|
关注:1
2013-05-23 12:21
求翻译:本设计为浙江华达钢业有限公司新建钢结构厂房(15吨~1250mm连续热镀铝锌机组)地下室基坑围护工程是什么意思?![]() ![]() 本设计为浙江华达钢业有限公司新建钢结构厂房(15吨~1250mm连续热镀铝锌机组)地下室基坑围护工程
问题补充: |
|
2013-05-23 12:21:38
The design for the Zhejiang the Huada Steel Co., Ltd. new steel plant (15 tons to 1250mm continuous hot galvanized unit) Basement Foundation Pit Support
|
|
2013-05-23 12:23:18
This design for Zhejiang China Steel Industry Co. , Ltd new steel plant (15 tons to 1250 mm continuous thermal aluminum-plated zinc units) basement of the engineering pit
|
|
2013-05-23 12:24:58
This design reaches the steel industry limited company newly built steel structure workshop for Zhejiang Jiang hua (15 ton ~1250mm continuously hot aluminum-plating zinc unit) the basement hole excavated for building foundation surrounding protection project
|
|
2013-05-23 12:26:38
This design for Zhejiang huada steel industries limited a new steel structure workshop (15 ton continuous hot galvanizing and aluminizing line ~1250mm) basement of Foundation pit support engineering
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区