当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:如果控制的设计包括管理层的分析,例如调查、解释财务报表的波动,为支持控制运行有效性的结论,我们应该考虑是否有必要进行一定程度的重新执行测试是什么意思?

待解决 悬赏分:1 - 离问题结束还有
如果控制的设计包括管理层的分析,例如调查、解释财务报表的波动,为支持控制运行有效性的结论,我们应该考虑是否有必要进行一定程度的重新执行测试
问题补充:

  • 匿名
2013-05-23 12:21:38
If the control design including management analysis such as surveys, to explain the fluctuations in the financial statements, to support the control run validity of the conclusions, we should consider whether it is necessary to a certain degree of re-run the test
  • 匿名
2013-05-23 12:23:18
If the control was designed to include management of the analysis, for example, investigation, and interpretation of the financial statements of the fluctuations, in order to support the operational effectiveness of the conclusions, and we should take into account whether or not there is a need for
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
If the design includes the management's analysis of the control, such as investigations, explain the fluctuations of the financial statements, to support the conclusion of control effectiveness, we should consider whether there is a need for a certain degree of repeat testing
  • 匿名
2013-05-23 12:28:18
If controls the design including the management level analysis, for example the investigation, the explanation finance report form undulation, for the support control movement valid conclusion, we should consider whether has the necessity to carry on certain degree the again execution test
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭