当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Abstract: Lack of personnel with Building Information Modeling BIM skills is a significant constraint retarding use of the technology in the architecture, engineering, and construction industry. Unless BIM is introduced into undergraduate civil engineering curricula in a fundamental way, graduate civil engineers will la是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Abstract: Lack of personnel with Building Information Modeling BIM skills is a significant constraint retarding use of the technology in the architecture, engineering, and construction industry. Unless BIM is introduced into undergraduate civil engineering curricula in a fundamental way, graduate civil engineers will la
问题补充:

  • 匿名
2013-05-23 12:21:38
摘要:建筑信息模型BIM技能人才的缺乏是一个重要的约束,延缓使用的建筑,工程和建筑行业的技术。除非BIM引入到本科土木工程课程的根本途径,研究生的土木工程师将缺乏在三维模型表达和设计意图的沟通的主要媒介和工程分析的基础上为建筑行业所需的技能。
  • 匿名
2013-05-23 12:23:18
摘要:由于缺乏人员,构建信息技术是一个博尔茨曼所促进会显著约束建模使用的减速的技术在建筑、工程和建筑行业。
  • 匿名
2013-05-23 12:24:58
摘要: 缺乏人员以塑造BIM技能的大厦信息是减速对技术的用途的signifi伪善言辞限制在建筑学、工程学和建筑业。 除非BIM被介绍入大学生土木工程师课程用一个根本方式,毕业生土木工程师将
  • 匿名
2013-05-23 12:26:38
摘要: 缺乏建筑信息建模 BIM 技能是人员的阻燃技术在建筑、 工程和施工行业的使用从而带来巨大的约束。除非 BIM 基本的方式引进本科土木工程专业课程,研究生土木工程师将缺乏为建造业的三维模型的表达和沟通的设计意图的主要媒介和工程分析的基础服务所需的技能。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭