求翻译:因甲方原因工程停建、缓建、变更计划、提供资料不准确、修改设计等给乙方造成损失的,甲方赔偿由此给乙方造成的一切经济损失。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
因甲方原因工程停建、缓建、变更计划、提供资料不准确、修改设计等给乙方造成损失的,甲方赔偿由此给乙方造成的一切经济损失。
问题补充:

  • 匿名
2013-05-23 12:21:38
Project because of Party A cease the production, postponed, change of plan, provided inaccurate information to modify the design and other losses to Party B, Party A shall indemnify Party B caused economic losses.
  • 匿名
2013-05-23 12:23:18
As a side project for suspension of the construction, the building, change plans, provide information is not accurate, and modify the design to Party B, such as loss of the party a compensation to Party B as a result of all economic losses.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Engineering construction, huanjian for party reasons, change of plans, the provision of inaccurate information, modify design loss to party b, party a compensation for all financial losses caused b.
  • 匿名
2013-05-23 12:28:18
Because the party of the first part reason project halts construction, the slow construction, the change plan, provides the material not not accurately, the revision design and so on causes the losses to the second party, the party of the first part compensates from this all economic losses which cr
 
 