当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:6.2乙方在动力设备、高压线路、地下管道附近及交通要道施工之前,必须做好安全防范措施。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
6.2乙方在动力设备、高压线路、地下管道附近及交通要道施工之前,必须做好安全防范措施。
问题补充:

  • 匿名
2013-05-23 12:21:38
6.2 Party B prior to construction of power equipment, high voltage lines, underground pipes in the vicinity and traffic arteries, must be prepared to safety precautions.
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
6.2 second parties nearby power equipment, high-pressured line, underground duct and before key communication line construction, must complete the safe guard measure.
  • 匿名
2013-05-23 12:26:38
6.2 b in power equipment, high-voltage lines, and prior to the construction of major traffic arteries near the underground pipes, must make a good safety precaution.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭