当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:7.2如果因为战争或其他双方无法控制的因素,合同签订后任何一方无法履行其合同义务,或根据合同适用法律,双方不必继续履约,则甲方针对已进行工程应支付给乙方的款额:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
7.2如果因为战争或其他双方无法控制的因素,合同签订后任何一方无法履行其合同义务,或根据合同适用法律,双方不必继续履约,则甲方针对已进行工程应支付给乙方的款额:
问题补充:

  • 匿名
2013-05-23 12:21:38
7.2 If because of war or other factors that the parties can not control after the signing of the contract, either party can not fulfill its contractual obligations, or under the applicable law of the contract, the two sides do not have to continue performance, the Party has been carrying out works t
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
7.2 If for war or other factors beyond the control of both sides, unable to fulfil their contractual obligations by either party after the contract, or under the law of contract, the two sides do not have to continue performing, you party a for the engineering amount that should be paid to party b h
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭