|
关注:1
2013-05-23 12:21
求翻译:施工结束后通道关闭区域:1F报警门锁、1F钢结构楼梯、3F贝尔特北梯、收货部通道。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
施工结束后通道关闭区域:1F报警门锁、1F钢结构楼梯、3F贝尔特北梯、收货部通道。
问题补充: |
|
2013-05-23 12:21:38
Construction is completed after the channel closed area: 1f alarm locks, the 1f steel staircases, 3f Belt North ladder, receiving Corridor.
|
|
2013-05-23 12:23:18
After construction work zones: 1 channel off F alarm door lock, 1 F steel staircase, 3 berth F North Ossetia, and receiving department.
|
|
2013-05-23 12:24:58
After the construction had finished the channel closes the region: 1F reports to the police the door lock, the 1F steel structure staircase, north 3F Boelter the ladder, receives goods a channel.
|
|
2013-05-23 12:26:38
Channel is closed after the end of construction area: 1F alarm door locks, steel 1F, 3F stairs Bell and ladder, receiving Department in the North channel.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区