求翻译:分别统计施工设备,利用需要系数法进行负荷计算,选择变压器和导线截面,合理设计三级配电与两级保护的设备,落实用电安全的技术与管理措施,同时作出临时用电的施工图与系统图。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
分别统计施工设备,利用需要系数法进行负荷计算,选择变压器和导线截面,合理设计三级配电与两级保护的设备,落实用电安全的技术与管理措施,同时作出临时用电的施工图与系统图。
问题补充:

  • 匿名
2013-05-23 12:21:38
, Respectively, the statistics of construction equipment, need coefficient method for load calculation, select the transformer and wire cross-section, the rational design of the three distribution with two protection devices, the implementation of electrical safety technology and management measures
  • 匿名
2013-05-23 12:23:18
Statistics, respectively, and construction equipment to be used for load calculations factor Law, select transformers and wire cross-section, reasonable design level 3 distribution and two levels of protection of the device, the power of the technology and security measures, as well as managing the
  • 匿名
2013-05-23 12:24:58
Counts the construction equipment separately, the use needs the method of correlates to carry on the load computation, chooses the transformer and the wire section, designs three levels of power distributions reasonably with two level of protection equipment, the realization uses electricity the saf
  • 匿名
2013-05-23 12:26:38
Statistics of construction equipment, respectively, need coefficient method for load calculations, selection and conductor cross section of transformer, reasonable design of three-level power distribution with two-level protection equipment, implementation of safety technology and management measure
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 