|
关注:1
2013-05-23 12:21
求翻译:2. 地面回填土须分层夯实,压实系数大于等于0.95;地面工程待室内管道及设备基础、排水沟施工完毕后再行施工。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2. 地面回填土须分层夯实,压实系数大于等于0.95;地面工程待室内管道及设备基础、排水沟施工完毕后再行施工。
问题补充: |
|
2013-05-23 12:21:38
Ground backfill shall compaction in layers, compacting factor greater than or equal to 0.95; ground works to be indoor plumbing and equipment base and gutter construction is completed after the line construction.
|
|
2013-05-23 12:23:18
2.floor to be hierarchical and laying back fill real-time, real-time factor is greater than or equal to 0.95 ; ground works to be indoor plumbing and sewer construction equipment, construction is finished to.
|
|
2013-05-23 12:24:58
2. The ground returns to the earth fill to have the lamination ramming, the compacting factor to be bigger than is equal to 0.95; After the ground project treats the room interior conduit and the equipment foundation, the drain construction finished constructs again.
|
|
2013-05-23 12:26:38
2. the backfill layer ground tamping, compacting factor greater than or equal to 0.95; indoor piping and equipment, drainage of surface engineering construction is completed before construction.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区