求翻译:海水泵房原○1轴侧FBZ因泵房整体移位后与烟道支架基础冲突,现将原○1轴侧FBZ柱顶标高由±0.000改为-2.500,并将编号改为FBZ1,详见附图01。是什么意思?![]() ![]() 海水泵房原○1轴侧FBZ因泵房整体移位后与烟道支架基础冲突,现将原○1轴侧FBZ柱顶标高由±0.000改为-2.500,并将编号改为FBZ1,详见附图01。
问题补充: |
|
2013-05-23 12:21:38
Original axis ○ 1 the side fbz due to the pumping station as a whole shift of the seawater pumping station with flue bracket base conflict, now the former ○ 1 axis the side fbz capitals elevation from ± 0.000 to -2.500, and renumbered fbz1 in detail Please refer to Plan 01.
|
|
2013-05-23 12:23:18
sea-water pump room FBZ ○1 shaft side of the pump room after the shift bracket base with conflict, is now the original ○1 FBZ top shaft side elevation by ±0.000 - 2.500 words and FBZ will be renumbered as 1, as detailed in figure 01.
|
|
2013-05-23 12:24:58
Because after the sea water pump house original 1 axes lean FBZ pump house whole shifting with the flue support foundation conflict, presently the original 1 axes will lean the FBZ mast top elevation by ±0.000 to change - 2.500, and will change the serial number FBZ1, will for details see attached f
|
|
2013-05-23 12:26:38
Original 0 1 axis side FBZ seawater pumping station pumping station after the whole shift conflicts with flue bracket base, original 0 1 axis side elevation ± 0.000 FBZ-column top to-2.5, and change the number to FBZ1, as described in Figure 01.
|
|
2013-05-23 12:28:18