当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:retrogression and other improper methods will cause the oil on the road surface pro package and pit. roller should be strictly forbidden to stop on the sections that are not cooling is best to stop stem structures, we have been engaged in an experiment, complex pressure to complete the sections (from 150m at) parked on是什么意思?

待解决 悬赏分:1 - 离问题结束还有
retrogression and other improper methods will cause the oil on the road surface pro package and pit. roller should be strictly forbidden to stop on the sections that are not cooling is best to stop stem structures, we have been engaged in an experiment, complex pressure to complete the sections (from 150m at) parked on
问题补充:

  • 匿名
2013-05-23 12:21:38
倒退和其他方法不当,会造成油路面亲包和坑。辊应严格禁止,停止不制冷是最好停止干结构的部分,我们一直从事实验,复杂的压力来完成的部分(从150米在)停鼓(6〜8T) ,10分钟后,平整度测量7毫米尽可能横缝必须认真解决,施工单位,往往省料缝不到位,造成贫困平坦。为了更好的直缝横缝
  • 匿名
2013-05-23 12:23:18
倒退的现象,其他不正当方法将导致的油道和坑表面pro软件包。
  • 匿名
2013-05-23 12:24:58
retrogression和其他不正当的方法在路面赞成包裹和坑将导致油。 在不冷却是最佳停止词根结构,我们参与了实验,复杂压力完成在鼓(从150m在)
  • 匿名
2013-05-23 12:26:38
倒退和其他不正当的方法将导致道路表面临封装和基坑的油。应严格禁止辊上的部分不是停止冷却是最好停止干结构,我们从事一项实验,完成部分 (从 150 米) 停泊在鼓上的复杂压力 (6 ~ ~ 8t 型),10 分钟后平整度的实测 7 毫米多伸缩缝必须认真解决,建设单位通常为 shengliao 缝不在的地方,造成的平整度差。为了更好地直缝横缝
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭