|
关注:1
2013-05-23 12:21
求翻译:The follow documents attached to this MR which shall be considered by Supplier as the design basis for the preparation of the bid and for the execution of the works.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The follow documents attached to this MR which shall be considered by Supplier as the design basis for the preparation of the bid and for the execution of the works.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区