|
关注:1
2013-05-23 12:21
求翻译:This design through applies the PLC controller, as regularly completes the elevator parallel control system take two eight elevators the overall project design and the simulation movement.Two parallel elevators are equipped with the base depot, generally takes the base depot by the building first floor.After an elevato是什么意思? 待解决
悬赏分:1
- 离问题结束还有
This design through applies the PLC controller, as regularly completes the elevator parallel control system take two eight elevators the overall project design and the simulation movement.Two parallel elevators are equipped with the base depot, generally takes the base depot by the building first floor.After an elevato
问题补充: |
|
2013-05-23 12:21:38
通过设计适用于PLC控制器,定期完成平行电梯控制系统的整体项目设计和模拟movement.two的平行电梯基站配备两个八电梯,一般需要通过一楼基站。电梯的执行顺序完成后,自我恢复基地depot.when另一个电梯完成所有的任务,暂停地板成就了锚准备好ladder.prepares,好梯子准备接受任何秩序以上基站出现,以move.this设计有重点研究电梯控制系统的电气原理设计,PLC选型和外部接线,变频器的设计,组态王模拟程序编译和仿真图片制作,组态王和西门子PLC的通信行控制。
|
|
2013-05-23 12:23:18
(副)
这么, 这样地
(形)
这; 今, 本; 这个
|
|
2013-05-23 12:24:58
这个设计通过应用PLC控制器,和通常完成电梯并行控制系统作为二八个电梯整体项目设计和模仿运动。二个平行的电梯装备以基地仓库,由大厦一楼一般采取基地仓库。在电梯以后执行单完成了,自已补救基地仓库。当另一个电梯完成它的所有任务时,停留最后停住准备好梯子的地板成就。准备好梯子是准备在基地仓库之上接受看上去移动的所有顺序。这个设计有以被学习电梯控制系统电子原则设计, PLC塑造和外部的重点 架线,变频管设计、配置国王被模仿的节目编辑和模仿图片制造、配置国王和Simens PLC书信网上控制。
|
|
2013-05-23 12:26:38
通过这种设计适用 PLC 控制器,如定期完成电梯并联控制系统取两家八个电梯的整体项目设计和模拟运动。两个平行的电梯都配备基站,通常采用的大楼一楼的基站。电梯后执行顺序完成,自恢复基站。当另一个电梯完成其所有任务时,将暂停地板的成就,这是准备好的梯子,终于定位。准备好梯子是准备接受以上出现移动基站的任何命令。这种设计重点研究了电梯控制系统的电气原理设计、 PLC 塑造和外部接线、 变频器设计、 配置国王模拟程序编译和模拟照片制作、 配置国王和西门子 PLC 函授在线控制。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区