当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对L形钢管混凝土柱正截面承载力的计算分析进行了初步尝试,主要进行了以下工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对L形钢管混凝土柱正截面承载力的计算分析进行了初步尝试,主要进行了以下工作
问题补充:

  • 匿名
2013-05-23 12:21:38
The calculation of the l-shaped steel tube concrete column section bearing capacity analysis of a preliminary attempt, mainly for the following work
  • 匿名
2013-05-23 12:23:18
The steel-concrete columns L are cross-sectional analysis of load carried out a preliminary attempt to, mainly for the following
  • 匿名
2013-05-23 12:24:58
Has carried on the preliminary attempt to the L profile steel tube coagulation earth pyramid right section supporting capacity computation analysis, mainly has carried on following work
  • 匿名
2013-05-23 12:26:38
On l-shape analysis on calculation of normal section bearing capacity of concrete filled steel tube a try, mainly for the following work
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭