当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Manufacturer is required to provide complete erected Tower and also complete plans, assembly drawings which summarize the Tower components and foundation specifications, other documentation showing the necessary marking and details for the proper assembly and installation of the material including the desig是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Manufacturer is required to provide complete erected Tower and also complete plans, assembly drawings which summarize the Tower components and foundation specifications, other documentation showing the necessary marking and details for the proper assembly and installation of the material including the desig
问题补充:

  • 匿名
2013-05-23 12:21:38
制造商须提供完成架设铁​​塔和完整的计划,装配图,总结塔组件和基础规范,其他文件,显示必要的标记,包括结构设计屈服强度合适的组装和安装材料的细节成员和要使用的结构螺栓等级。制造商应采用的质量控制程序,以确保工程制造,安装及相关活动满足规范的要求。拖曳的生命周期应至少50年。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
要求制造商提供完全被架设的塔并且完成计划,总结塔组分和基础规格,显示必要的标号和细节为材料适当的装配和设施的其他文献包括结构件设计出产量和结构螺栓等级将使用的哪些的总图。 制造者将雇用保证的质量控制计划设计制造,架设和相关的活动符合规格的要求。 拖曳的生命周期将是50年极小的。
  • 匿名
2013-05-23 12:26:38
制造商须提供完整竖立的塔,也完整计划总结塔组件和基础规格、 其他显示所需的标记和正确的程序集和材料,包括设计安装的详细信息的文档的组件绘图屈服强度的结构构件和品位的结构螺栓,要使用。制造商不得雇用质量控制的程序,将确保工程制作、 安装及有关活动符合规范的要求。生命周期的两种须 50 年以上。
  • 匿名
2013-05-23 12:28:18
制造商须提供完整竖立的塔,也完整计划总结塔组件和基础规格、 其他显示所需的标记和正确的程序集和材料,包括设计安装的详细信息的文档的组件绘图屈服强度的结构构件和品位的结构螺栓,要使用。制造商不得雇用质量控制的程序,将确保工程制作、 安装及有关活动符合规范的要求。生命周期的两种须 50 年以上。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭