|
关注:1
2013-05-23 12:21
求翻译:对高危施工(点)项目要分部、分项地编制安全施工措施方案,给施工人员进行安全技术交底,并作好书面记录及当事人签字。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
对高危施工(点)项目要分部、分项地编制安全施工措施方案,给施工人员进行安全技术交底,并作好书面记录及当事人签字。
问题补充: |
|
2013-05-23 12:21:38
On the segment of high-risk construction (points) project, preparation of sub-construction safety measures program, technical tests, construction workers safety, and make a written record and the parties sign.
|
|
2013-05-23 12:23:18
Construction of high-risk (points) project, to be prepared with a construction safety program of measures, construction personnel to conduct a security technology to the end of the day, and written records and the parties sign it.
|
|
2013-05-23 12:24:58
() The project wants the branch, the sub-item establishment safe construction measure plan to the high-risk construction, carries on the safety work for the constructor to give the low-down, and finishes the written recording and the litigant signs.
|
|
2013-05-23 12:26:38
On construction of high risk (dot) Division, projects and construction measures of security programming, security technology to give the low-down the builders, and well recorded in writing and signed by the parties.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区