|
关注:1
2013-05-23 12:21
求翻译:1)是否应该补做5902的消防二次报建(即前面所说的“报消防设计审核及消防竣工验收手续”)是什么意思? 待解决
悬赏分:1
- 离问题结束还有
1)是否应该补做5902的消防二次报建(即前面所说的“报消防设计审核及消防竣工验收手续”)
问题补充: |
|
2013-05-23 12:21:38
1) Should the make up to do the 5902 fire the second to be built (ie, the previously mentioned "reported fire design review and fire the final acceptance procedures")
|
|
2013-05-23 12:23:18
1) whether or not it should be up to 5902 times the fire 2 times (i.e. , the front of the Fire Protection Design completion and acceptance audit and fire prevention procedures")
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
1) should fire 5,902 supplementation of the second report (that is, earlier said the "fire-fighting design review and acceptance procedures of fire")
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区