|
关注:1
2013-05-23 12:21
求翻译:在1997年7月,8月和9月从大连港分三批平均装运,目的港为伦敦,允许分批和转运。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在1997年7月,8月和9月从大连港分三批平均装运,目的港为伦敦,允许分批和转运。
问题补充: |
|
2013-05-23 12:21:38
In July 1997, August and September from the Dalian Port in three tranches an average of shipment, port of destination in London, allowing partial and transit.
|
|
2013-05-23 12:23:18
In 1997, and July, August and September 3 in Hong Kong from Dalian batch average shipping to Hong Kong to London, which allows splitting and transit.
|
|
2013-05-23 12:24:58
In July, 1997, in August and in September divided three batch of average shipping from Dalian Port, the port of destination is London, the permission in turn with the transportation.
|
|
2013-05-23 12:26:38
In July 1997, in August and September, shipped three batches averaging from Dalian port, port of London, allows batch and transport.
|
|
2013-05-23 12:28:18
in July 1997, August and September 3 in Hong Kong from Dalian batch average shipping to London, Hong Kong, allowing batch and transit. ;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区