|
关注:1
2013-05-23 12:21
求翻译:The inquiry document is prepared based on the technical conditions of 2 billion Nm3 coal-based natural gas provided by China Tianchen Engineering Corporation under the authorization of the owner and the preliminary technical exchanges between both of us, and also on the precondition that the previous technical conditio是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The inquiry document is prepared based on the technical conditions of 2 billion Nm3 coal-based natural gas provided by China Tianchen Engineering Corporation under the authorization of the owner and the preliminary technical exchanges between both of us, and also on the precondition that the previous technical conditio
问题补充: |
|
2013-05-23 12:21:38
调查文件准备2亿美元NM3煤为主的所有者和初步的技术交流,我们双方之间的授权下,由中国天辰工程公司提供的天然气的技术条件的基础上,还上的前提下,以前的技术basically.the调查文件准备2亿元NM3煤为主的天然所有者和初步的技术交流,我们双方之间的授权下由中国天辰工程公司提供天然气的技术条件的基础上,条件不改变,也以前的技术条件下,基本上没有改变的前提条件。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
询问文件准备根据中国提供的2十亿Nm3煤炭为主的天然气
|
|
2013-05-23 12:26:38
查询文档准备基于 2 亿 Nm3 所有者和初步技术交流的我们,和也的前提是,以前的技术条件不上都授权下由中国天辰工程公司提供基于煤的天然气基本上改变了技术条件。查询文档准备基于 2 亿 Nm3 所有者和初步技术交流的我们,和也的前提是,以前的技术条件不上都授权下由中国天辰工程公司提供基于煤的天然气基本上改变了技术条件。
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区