求翻译:另一种方法是压缩一个或多个关键工作的工期,首先要检查每个关键工作是否能压缩,压缩一项关键工作有多种方法,如可以增加人员、加班、增加施工设备等是什么意思?

待解决 悬赏分:1 - 离问题结束还有
另一种方法是压缩一个或多个关键工作的工期,首先要检查每个关键工作是否能压缩,压缩一项关键工作有多种方法,如可以增加人员、加班、增加施工设备等
问题补充:

  • 匿名
2013-05-23 12:21:38
Another method is to compress the duration of one or more critical tasks, we must first check whether each of the key work to compress the compression of a key work a number of ways, such as increasing staff, overtime, increase in construction equipment
  • 匿名
2013-05-23 12:23:18
Another method is in a compressed one or more critical work of the project, the first to check whether each of the critical work can be compressed, the Compression A key work in a number of ways, such as an increase in personnel, overtime, increased construction equipment, etc.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Another method is to compress the duration of one or more of the key work, first you want to check each key can compress, compress a key work there are a number of ways, such as increased personnel, overtime, construction equipment
  • 匿名
2013-05-23 12:28:18
Another method reduces or a many key work time limit for a project, first must inspect each key to work whether can compress, reduces a key work to have many kinds of methods, like may increase the personnel, working overtime, the increase construction equipment and so on
 
 