当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据工作项目的客观情况,结合以往的申报经验,预估计各项工作的持续时间,见表4-3所示。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据工作项目的客观情况,结合以往的申报经验,预估计各项工作的持续时间,见表4-3所示。
问题补充:

  • 匿名
2013-05-23 12:21:38
The objective of the work items, combined with past experience of the declaration, the duration of pre-estimate the work as shown in Table 4-3.
  • 匿名
2013-05-23 12:23:18
In accordance with the objective of the project, combined with the previous reporting experience, pre-estimated the length of time, as shown in Table 4-3.
  • 匿名
2013-05-23 12:24:58
According to the work project objective situation, unifies the former declaration experience, estimated in advance each work the duration, sees Table 4-3 to show.
  • 匿名
2013-05-23 12:26:38
According to the objective of the project, combined with the previous reporting experience, estimated duration of the work, as shown in table 4-3.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭