求翻译:(3)关键路径上的耗时是可以完工的最短时间量,若缩短关键路径的总耗时,会缩短项目工期;反之,则会延长整个项目的总工期。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
(3)关键路径上的耗时是可以完工的最短时间量,若缩短关键路径的总耗时,会缩短项目工期;反之,则会延长整个项目的总工期。
问题补充: |
|
2013-05-23 12:21:38
(3) on the critical path time-consuming to be completed in the shortest amount of time, if the total time-consuming to shorten the critical path, will shorten the duration of the project; the contrary, it will extend the total duration of the entire project.
|
|
2013-05-23 12:23:18
(3) the time-consuming on the critical path can be completed in the shortest amount of time, if you reduce the critical path, and reduces the time-consuming project duration; instead, they are extended throughout the project's overall project duration.
|
|
2013-05-23 12:24:58
In (3) essential way consumes when is most short-time room area which may finish, when reduces the essential way always consumes, can reduce the project time limit for a project; Otherwise, then can lengthen entire project the total time limit for a project.
|
|
2013-05-23 12:26:38
(3) take on the critical path is the minimum amount of time that can be completed, total time consuming if shorten the critical path, will shorten the duration of the project, but will extend the overall duration of the project as a whole.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|