当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:We need the tooling dies, which can be used in 110t, 160t, 200t, 250t, 315t, 500t, 630t, to be transported for try out and 3600 pcs parts production in Xiangtan at the end of this month. Please prepare a tooling delivery schedule with Wise and Jinyong.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
We need the tooling dies, which can be used in 110t, 160t, 200t, 250t, 315t, 500t, 630t, to be transported for try out and 3600 pcs parts production in Xiangtan at the end of this month. Please prepare a tooling delivery schedule with Wise and Jinyong.
问题补充:

  • 匿名
2013-05-23 12:21:38
我们需要的,可在110吨使用的工装模具,160T,200T,250T,315T,500T,630T,尝试在本月底的3600件零部件生产在湘潭待运。请准备一个明智和金庸的工装按期交货。
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭