当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:B、设计交底会:理解设计意图、特殊要求,将相关施工图、执行的规范、标准及相关要求文件下发给承包商;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
B、设计交底会:理解设计意图、特殊要求,将相关施工图、执行的规范、标准及相关要求文件下发给承包商;
问题补充:

  • 匿名
2013-05-23 12:21:38
b, Design Details: understanding the design intent, special requirements related to construction plans, implementation of norms, standards and related requirements document issued to the contractor;
  • 匿名
2013-05-23 12:23:18
B, design would be: To understand the design intent, specific requirements, related to the construction and implementation of specifications, standards and related requirements document to the contractor.
  • 匿名
2013-05-23 12:24:58
B, the design gives the low-down the meeting: The understanding design intention, the special request, will be connected the construction drawing, the execution standard, the standard and the correlation request document after-crops for the contractor;
  • 匿名
2013-05-23 12:26:38
B, designed to give the low-down: understand the design intent, special requirements, the construction plans, the implementation of norms, standards and related requirements documents issued to the contractor;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭