|
关注:1
2013-05-23 12:21
求翻译:Step 5: Align the primary alignment hole in the PWB with the hole in the threaded insert in the connector: The primary alignment hole is the round hole (in the center of a three-hole pattern, or at one end of a two-hole pattern). Using the same magnification device that was used in Step 4, check to see that the round h是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Step 5: Align the primary alignment hole in the PWB with the hole in the threaded insert in the connector: The primary alignment hole is the round hole (in the center of a three-hole pattern, or at one end of a two-hole pattern). Using the same magnification device that was used in Step 4, check to see that the round h
问题补充: |
|
2013-05-23 12:21:38
第5步:螺纹连接器插入孔配合的工作计划和预算的主要定位孔:主要定位孔是圆孔(三洞图案的中心,或在两孔的一端模式)。使用相同的放大设备,在步骤4中使用,检查地看到,在PWB的圆孔在螺纹连接器插入孔(检查工作计划和预算方面,而不是连接器端)完全一致。它可能需要稍稍向后移动PWB的边缘(在“Y”方向)连接器,以实现完美的“Y”方向的孔对齐。这一调整必须是非常准确的,因为很少有安装孔和螺杆外径之间的间隙。如果两孔几乎完全一致,
|
|
2013-05-23 12:23:18
步骤5:将主要对齐孔中的孔,pwb的螺纹插件中的连接器:主要对齐孔是圆孔(在该中心的一个三孔,或在一个结束的一个双孔模式)。 使用同一放大设备,是在第4步中所使用,请检查在pwb的圆孔的孔是完全一致的在线程插入到连接器中(检查的pwb端(而不是
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区