|
关注:1
2013-05-23 12:21
求翻译:Step 11: Remove the “lead organizer” or “tie bar”: Although it is not absolutely required, most customers choose to remove the organizer after the connector is soldered to the PWB. Unless otherwise specified by the customer, the SMT leads are scored on the underside (the side closest to the surface of the PWB, between 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Step 11: Remove the “lead organizer” or “tie bar”: Although it is not absolutely required, most customers choose to remove the organizer after the connector is soldered to the PWB. Unless otherwise specified by the customer, the SMT leads are scored on the underside (the side closest to the surface of the PWB, between
问题补充: |
|
2013-05-23 12:21:38
第11步:删除“牵头主办单位”或“拉杆”:虽然它不是绝对需要的,大多数客户选择删除后连接器焊接到PWB主办。除非客户指定,SMT引线得分底面(方最接近焊脚和组织者,PWB表面之间),以方便主办单位的搬迁。偶尔顾客可能要离开theorganizer重视和具体要求,空中飞行没有进球的线索,但在大多数情况下,得分将出席。主办单位在任何情况下都不应被删除焊接前,不应试图删除主办如果引线没有被损坏焊点的概率很高,因为进球。删除的组织者,回折向连
|
|
2013-05-23 12:23:18
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区