|
关注:1
2013-05-23 12:21
求翻译:Also, replacement will be required due to the considerable increase in traffic volume beyond the structure's initial design capabilities, and the significant increase in the allowable vehicular loads using the highway system in the past two decades,aggravating the problem withthe existing structures.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Also, replacement will be required due to the considerable increase in traffic volume beyond the structure's initial design capabilities, and the significant increase in the allowable vehicular loads using the highway system in the past two decades,aggravating the problem withthe existing structures.
问题补充: |
|
2013-05-23 12:21:38
此外,更换须由于交通量超出结构的初步设计能力的大幅度增加,在允许的车辆使用,在过去二十年的公路系统,负荷加重现有结构问题withthe显着增加。
|
|
2013-05-23 12:23:18
另外,由于所需更换的大量增加的交通量超过结构的初步设计能力,大幅增加了允许使用车辆负载的公路系统在过去二十年,使这个问题在现有的结构。
|
|
2013-05-23 12:24:58
并且,替换需要的归结于在话务量的可观的增量在结构的最初的设计能力之外和在允许的交通工具的装载的重大增量使用高速公路系统在过去二十年内,加重问题与现有的结构。
|
|
2013-05-23 12:26:38
此外,更换将大量增加交通流量超出最初的设计能力的结构,由于要求和所允许车辆大幅增加负载使用公路系统在过去的二十年里,加重问题奴隶制度的现有结构。
|
|
2013-05-23 12:28:18
另外,替代将由于在交通卷方面在结构的最初设计能力之外的重要的增长需要,以及在使用高速公路系统的允许作为媒介的负荷方面的显著增长在过去二十年,使问题恶化 withthe 现有结构。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区