求翻译:2012年底即将建成的海上风电塔架生产基地,比邻长江口十万吨级船舶深水码头,占地面积20多万平方米,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2012年底即将建成的海上风电塔架生产基地,比邻长江口十万吨级船舶深水码头,占地面积20多万平方米,
问题补充:

  • 匿名
2013-05-23 12:21:38
About to be completed by the end of 2012, offshore wind power tower production base, 100-ton ship deep-water pier adjacent to the Yangtze Delta, covering an area of ​​more than 20 million square meters,
  • 匿名
2013-05-23 12:23:18
Completion of the upcoming end of 2012 the sea wind tower manufacturing base, and the estuary adjacent 100,000 -ton ship deep-water pier, floor space, and 20 more than 10,000 square meters
  • 匿名
2013-05-23 12:24:58
2012 year's end soon complete sea winning side electricity tower production base, neighbor Changjiang delta ten 10 thousand-ton ships deep water wharf, area more than 20 ten thousand square meters,
  • 匿名
2013-05-23 12:26:38
2012 the end of offshore wind Tower production base to be built, adjacent to 100,000-ton ship of Yangtze estuary deepwater Wharf, covering an area of more than 200,000 square metres,