|
关注:1
2013-05-23 12:21
求翻译:在存放场地可选择有足够承重能力的外场内部位置进行,码头位置为吊装发运预留。以20万吨钢结构计划,共需外场拼装面积约29.5万平方米。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在存放场地可选择有足够承重能力的外场内部位置进行,码头位置为吊装发运预留。以20万吨钢结构计划,共需外场拼装面积约29.5万平方米。
问题补充: |
|
2013-05-23 12:21:38
Storage site can choose a field of sufficient load-bearing capacity of the internal position terminal position is reserved for the lifting shipped. 20 tons of steel structure projects, totaling field assembling an area of about 295,000 square meters.
|
|
2013-05-23 12:23:18
At sites where you can select a sufficient load capacity within the field, the terminal position location for lifting the shipping. With a 200,000 -ton steel construction, with a total field area of about 295,000 square meters.
|
|
2013-05-23 12:24:58
Is depositing the location to be possible to choose has the enough bearing power outfield interior position to carry on, wharf position for hoisting shipping out reservation.By 200,000 ton steel structure plans, altogether needs the outfield assembling area approximately 295,000 square meters.
|
|
2013-05-23 12:26:38
At storage sites have sufficient load-bearing capacity can be selected within the field of location, Terminal locations set aside for lifting ship. 200,000 tons of steel structure projects, total area of 295,000 square field assembled.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区