当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:design transmission line with double circuits crossing the Mekong from Nakhon Phanom to Thakhek town is connected to a new Thakhek substation and then from the new Thakhek substation to a gold\copper mine (Xepon Mine)in the year 2005 and a new Cement factory (Mahaxai town),Khammouan province in the year2006是什么意思?

待解决 悬赏分:1 - 离问题结束还有
design transmission line with double circuits crossing the Mekong from Nakhon Phanom to Thakhek town is connected to a new Thakhek substation and then from the new Thakhek substation to a gold\copper mine (Xepon Mine)in the year 2005 and a new Cement factory (Mahaxai town),Khammouan province in the year2006
问题补充:

  • 匿名
2013-05-23 12:21:38
设计越过湄公河那空拍侬他曲镇双回路输电线路连接到一个新的他曲变电站,然后从他曲变电站黄金\铜矿于2005年(Xepon矿)和一个新的水泥厂(Mahaxai镇),甘蒙省在year2006
  • 匿名
2013-05-23 12:23:18
设计传输线与双重电路过境的湄公河从那空帕侬,thakhek镇连接到了一个新thakhek电力分站,然后从该新thakhek变电站至一个黄金\铜排雷(xepon雷)在2005年,一个新水泥工厂(mahaxai城)、落户省在2006年
  • 匿名
2013-05-23 12:24:58
设计送电线用横渡Mekong从Nakhon Phanom的双重电路对Thakhek镇在year2006连接到一个新的Thakhek分站然后从新的Thakhek分站到一个goldcopper矿(Xepon矿)在2005年和一家新的水泥工厂(Mahaxai镇), Khammouan省
  • 匿名
2013-05-23 12:26:38
Thakhek 镇从那空拍侬渡湄公河的双电路设计输电线路连接到新的 Thakhek 变电站,然后再从新的 Thakhek 变电站,gold\copper 矿 (Xepon 矿) 在 2005 年新水泥厂 (Mahaxai 镇)、 year2006 甘蒙省
  • 匿名
2013-05-23 12:28:18
Thakhek 镇从那空拍侬渡湄公河的双电路设计输电线路连接到新的 Thakhek 变电站,然后再从新的 Thakhek 变电站,goldcopper 矿 (Xepon 矿) 在 2005 年新水泥厂 (Mahaxai 镇)、 year2006 甘蒙省
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭