|
关注:1
2013-05-23 12:21
求翻译:10) 连管双拖上的注入头在运输过程中需要对注入头本体进行支撑,目前我们只对注入头框架进行了支撑(虽然研发的方工已经展示了本体和框架的连接处已进行了紧固,但需要落实注入头上端的固定是否存在问题)。是什么意思?![]() ![]() 10) 连管双拖上的注入头在运输过程中需要对注入头本体进行支撑,目前我们只对注入头框架进行了支撑(虽然研发的方工已经展示了本体和框架的连接处已进行了紧固,但需要落实注入头上端的固定是否存在问题)。
问题补充: |
|
2013-05-23 12:21:38
10) injected into the head tube on the Pair Trawler even injected into the head body support during transport, we injected into the head frame support (research and development of party workers have demonstrated the junction of the body and framework have been carried out tightening, but the need to
|
|
2013-05-23 12:23:18
10) * A tube double-drag and drop into the head on the transport needs to be in the process of filling out the body, of which we currently only support the injection and framework for the research and development support (although the work has been exhibited by the body and the connection of the fra
|
|
2013-05-23 12:24:58
10) The connecting pipe double tows the injector head needs to carry on the support in the transportation process to the injector head main body, at present we only have carried on the support to the injector head frame (although researches and develops side labor had already demonstrated main body
|
|
2013-05-23 12:26:38
10) even dual-injection on the drag head into head and body in the course of transport need to be supported, at present we have only the first framework to inject support (although Fang Gong has shown a body and framework of research and development at the connection of a fastening, but needs to be
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区