|
关注:1
2013-05-23 12:21
求翻译:Please see the attachment. Those are the operation and commissioning parts of UNIT which we have already picked out from the Tender Documents. It mainly involves to the boiler, turbine-generator set and the FGD system. It is required to describe each system separately which is different from Kozienice project. We would是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Please see the attachment. Those are the operation and commissioning parts of UNIT which we have already picked out from the Tender Documents. It mainly involves to the boiler, turbine-generator set and the FGD system. It is required to describe each system separately which is different from Kozienice project. We would
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区