当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:发、承包双方应按照国家标准《建设工程工程量清单计价规范》(GB50500—2008)的规定,在施工合同中约定人工、材料、机械等市场价格变化的风险范围和幅度及超出幅度的调整方法。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
发、承包双方应按照国家标准《建设工程工程量清单计价规范》(GB50500—2008)的规定,在施工合同中约定人工、材料、机械等市场价格变化的风险范围和幅度及超出幅度的调整方法。
问题补充:

  • 匿名
2013-05-23 12:21:38
Hair, the two contracting parties shall be in accordance with the provisions of the national standard "construction project list pricing norms (gb50500-2008) in the construction contract agreed upon the scope and extent of risk of changes in market prices of labor, materials, machinery, etc., and be
  • 匿名
2013-05-23 12:23:18
Both sides should be made, the contractor in accordance with the national standards project construction specifications list price of 50,500 - 2008 (GB), agreed in the contract in the construction labor, materials, machinery, and other market prices change scope and magnitude of risk adjustment and
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
, Contracting Parties shall, in accordance with the national standard of the codes for engineering Bill pricing of building engineering (GB50500-2008) provisions of the conventions in the construction contract labor, materials, machinery and other price changes in the scope and extent of the risk an
  • 匿名
2013-05-23 12:28:18
Sends, contracts both sides to be supposed to defer to the national standards "Construction project Resilience Detailed list To count Price Standard" (GB50500-2008) stipulation, agrees current price on market declension and so on the man-power, material, machinery in the turn-key contract risk scope
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭