|
关注:1
2013-05-23 12:21
求翻译:2) If included, which number is the baseline you multiply with 2% ( Base tooling cost was the baseline defined in the RFQ. By base tooling cost means the cost exclude the Pre-Production Panels, Inspection Costs, Freight, Commissioning and Project Management cost);是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2) If included, which number is the baseline you multiply with 2% ( Base tooling cost was the baseline defined in the RFQ. By base tooling cost means the cost exclude the Pre-Production Panels, Inspection Costs, Freight, Commissioning and Project Management cost);
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区