当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Other important factors were labor costs and the manufacturing system utilized at the facility. The cost of labor for the entire process was less than 10 percent of the total production and packaging costs. The plant had a working Materials Requirements Planning (MRP) system in place and used MRP for ordering all raw m是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Other important factors were labor costs and the manufacturing system utilized at the facility. The cost of labor for the entire process was less than 10 percent of the total production and packaging costs. The plant had a working Materials Requirements Planning (MRP) system in place and used MRP for ordering all raw m
问题补充:

  • 匿名
2013-05-23 12:21:38
其他重要的因素是劳动力成本和制造系统利用设施。在整个过程中的劳动成本是不到10%的总的生产和包装成本。工厂的工作物料需求规划到位(MRP)系统和MRP用于订购所有原材料,精密铣床购买的情况除外。没有使用MRP系统来安排生产。
  • 匿名
2013-05-23 12:23:18
其他的重要因素是劳动力成本和制造系统的利用的设施。 劳动成本的整个过程不到10%的生产和包装费用。 该厂有一个工作材料要求计划(mrp)系统,并使用mrp订购所有原材料从精密铣削除的情况下购买。 这是没有使用mrp系统安排生产。
  • 匿名
2013-05-23 12:24:58
其他重要因素是人工成本和制造系统被运用在设施。 劳动成本为整个过程是少于总生产和包装的费用的10%。 植物有一个运作的物资装备计划(MRP)系统和到位半新MRP为命令所有原材料除了%E
  • 匿名
2013-05-23 12:26:38
其他重要的因素是劳动力成本和利用设施的制造系统。整个进程成本是劳动力的小于 10%的总生产和包装成本。植物到位了材料需求计划 (MRP) 系统的工作,并且使用 MRP 订购所有原料从精度铣削购买的情况例外。MRP 系统不用于安排生产。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭