当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:深基坑工程涉及结构工程、岩土工程和环境工程等众多学科领域,综合性高,影响因素多,设计计算理论还不成熟,在一定程度上还依赖于工程实践经验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
深基坑工程涉及结构工程、岩土工程和环境工程等众多学科领域,综合性高,影响因素多,设计计算理论还不成熟,在一定程度上还依赖于工程实践经验。
问题补充:

  • 匿名
2013-05-23 12:21:38
Deep excavation works involve many disciplines of structural engineering, geotechnical engineering and environmental engineering, integrated high-influencing factors, the theory is not yet ripe for design calculations, to a certain extent also depends on engineering practice.
  • 匿名
2013-05-23 12:23:18
deep pit involves structural engineering, geotechnical engineering and environmental engineering, and many other areas of study, with a comprehensive, high-impact factors, design theory of computing, it is not yet at a certain extent, it depends on engineering practice and experience.
  • 匿名
2013-05-23 12:24:58
The deep hole excavated for building foundation project involves the structural engineering, the ground project and the environment project and so on the multitudinous discipline domain, the comprehensive nature is high, affects the factor to be many, the design calculation theory is not mature, als
  • 匿名
2013-05-23 12:26:38
Deep Foundation pit engineering related to structural engineering, geotechnical engineering, environmental engineering and many other fields, comprehensive high, affecting factors and design theory is not yet mature, to a certain extent dependent on engineering practice experience.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭