|
关注:1
2013-05-23 12:21
求翻译:本设计是济南市珍珠泉大厦的基坑支护设计。地基土层主要由填土、淤泥质粉质粘土、粘土、残积土构成。土质情况很差,在整个开挖深度范围内均为杂填土及淤泥质土;且施工面狭窄,基坑西侧距原建筑物最近处仅为0.4m,采用一般常用的支护方法根本没有施工空间。是什么意思?![]() ![]() 本设计是济南市珍珠泉大厦的基坑支护设计。地基土层主要由填土、淤泥质粉质粘土、粘土、残积土构成。土质情况很差,在整个开挖深度范围内均为杂填土及淤泥质土;且施工面狭窄,基坑西侧距原建筑物最近处仅为0.4m,采用一般常用的支护方法根本没有施工空间。
问题补充: |
|
2013-05-23 12:21:38
The design is the foundation pit support design of the building of Jinan City zhenzhuquan. The foundation soil fill, silty clay, clay, residual soil composition. Poor soil conditions, are in the entire excavation depth range of miscellaneous fill and silt soil; and narrow construction, the nearest p
|
|
2013-05-23 12:23:18
This design is Jinan city building in Koizumi's pearl pit design support. Foundation by filling the layer key quality powder quality mud, clay, clay, and the earth. Soil quality is poor, in digging up the entire depth range of the filling and mud soils; and the narrow construction pit, the west side
|
|
2013-05-23 12:24:58
This design is the Jinan Zhenzhu spring building hole excavated for building foundation supports and protections design.Ground soil layer mainly by earth fill, silt argillaceous silty clay, clay, weathering product soil formation.The soil texture situation is very bad, in the entire cutting depth sc
|
|
2013-05-23 12:26:38
This design is the Pearl spring mansion Foundation pit support design of Jinan. Foundation soil mainly consists of filled soil, silty clay, clay, residual soil composition. Very poor soil conditions throughout the excavation depth were filled within soil and silty soil; construction and narrow pit f
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区