当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:能够完成后端整体规划、布局、时钟树综合、布线、功耗分析,信号完整性分析等工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
能够完成后端整体规划、布局、时钟树综合、布线、功耗分析,信号完整性分析等工作
问题补充:

  • 匿名
2013-05-23 12:21:38
Able to complete the back-end overall planning, layout, clock tree synthesis, routing, power analysis, signal integrity analysis, etc.
  • 匿名
2013-05-23 12:23:18
To be able to back-end integrated planning, layout, clock-tree synthesis, cabling, power analysis, and signal integrity analysis, etc.
  • 匿名
2013-05-23 12:24:58
Rear end can complete the whole plan, the layout, the clock tree synthesis, the wiring, the power loss analysis, work and so on signal integrity analysis
  • 匿名
2013-05-23 12:26:38
Overall planning, layout, complete back-end analysis of clock tree synthesis, cabling, power, signal integrity analysis and so on
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭