当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The project including Engineering, procurement and construction pre- commissioning and commissioning of the power plants and the acceptance testing of all the facilities and the equipments required to guarantee the installed capacity of the national electrical system of 972MW (1st phase) located in the area defined by 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The project including Engineering, procurement and construction pre- commissioning and commissioning of the power plants and the acceptance testing of all the facilities and the equipments required to guarantee the installed capacity of the national electrical system of 972MW (1st phase) located in the area defined by
问题补充:

  • 匿名
2013-05-23 12:21:38
包括工程,采购和建设项目的预调试和调试,发电厂和要求,以保证全国电力系统972mw(第一阶段)中定义的区域位于装机容量的所有设施和设备的验收测试由PDVSA。新足底CENTRO电厂,其中包括4个单位的SGT6-5000F,由西门子公司总额定容量的772mw(4×193mw)标准条件下,包括新的LA卡布雷拉电厂2台LMS100,由GE与额定总200MW(2×100MW)的标准条件下的能力。
  • 匿名
2013-05-23 12:23:18
该项目包括工程、采购和建筑前调试和试运行的发电厂和接受测试的所有设施和设备的安装所需的能力保证国家的电气系统的972mw(第1阶段),位于石油公司(pdvsa)界定的区域中。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
项目包括工程、 采购和施工前调试和发电厂和验收测试的所有设施、 设备的调试所
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭