当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:然后对一段多交叉口干道进行了干线协调设计,其中包括单个交叉口的渠化,配时,干线的协调计算是什么意思?

待解决 悬赏分:1 - 离问题结束还有
然后对一段多交叉口干道进行了干线协调设计,其中包括单个交叉口的渠化,配时,干线的协调计算
问题补充:

  • 匿名
2013-05-23 12:21:38
Trunk coordination of design and then a period of more than the intersection of roads, including a single intersection Channelization, Timing, coordination in trunk
  • 匿名
2013-05-23 12:23:18
And then for a period of more cross-port for the route 3 highway design, including a single junction, with the drainage of the coordination, the route is calculated
  • 匿名
2013-05-23 12:24:58
Then has carried on the skeleton line coordination design to more than a section of road intersection yang or male principle, including the single road intersection channelization, the timing, the skeleton line coordinated computation
  • 匿名
2013-05-23 12:26:38
Then over a period of many roads at intersections and trunk coordination design, including a single intersection channelization, timing, coordination of route calculation
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭