|
关注:1
2013-05-23 12:21
求翻译:通过本次设计要求我们综合运用所学的知识,独立地完成资料的收集整理,工程量的计算,定额和工程估价表的应用,掌握建设工程投标书的编制及投标报价、技术经济分析和工程量清单计价的基本方法。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
通过本次设计要求我们综合运用所学的知识,独立地完成资料的收集整理,工程量的计算,定额和工程估价表的应用,掌握建设工程投标书的编制及投标报价、技术经济分析和工程量清单计价的基本方法。
问题补充: |
|
2013-05-23 12:21:38
This design requires us to apply the knowledge, independent data collected, the calculation of quantities, quotas and the application of engineering valuation table, grasp the construction project tender preparation and tender offer, the technical and economic analysis and engineering the bill of qu
|
|
2013-05-23 12:23:18
By the time we have an integrated application designed for the knowledge, the independent and complete the collection of data collation, the amount of computing and engineering, the fixed Valuation Table of applications, knowledge of construction bids and tenders, technical and economic analysis and
|
|
2013-05-23 12:24:58
Requests us through this design to synthesize the knowledge which the utilization studies, completes the material independently the collection reorganization, the resilience computation, the fixed quantity and the project estimate table application, the grasping construction project tender establish
|
|
2013-05-23 12:26:38
Through this integrated application design requires that we have acquired knowledge, to complete the data collection independently, calculation of quantities, scale and engineering application of valuation tables, master the construction project tendering and bidding, technical-economic analysis and
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区