当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对柳江至龙南K9——K18路段进行9km二级路的提等改造设计,该路段全线总长17491m,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对柳江至龙南K9——K18路段进行9km二级路的提等改造设计,该路段全线总长17491m,
问题补充:

  • 匿名
2013-05-23 12:21:38
Liu Jiang Zhilong South K9 - k18 sections of the the 9km two road mentioned and other modified design, this section of road across the board total length of 17491m
  • 匿名
2013-05-23 12:23:18
In the willow River to Kowloon Southern K K 18 9 - 9 km road to level 2, the transformation design, the full length 17,491 m sections.
  • 匿名
2013-05-23 12:24:58
The K9--K18 road section carries on the 9km two levels of roads to Liujiang to the dragon south to propose and so on the transformation designs, this road section entire line total length 17491m,
  • 匿名
2013-05-23 12:26:38
Liujiang to Longnan K9--K18 road reconstruction design of 9km secondary road, the total length of road sections across the 17491m,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭