求翻译:根据悬臂施工挂篮的起吊能力对主梁进行施工节段的划分是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据悬臂施工挂篮的起吊能力对主梁进行施工节段的划分
问题补充:

  • 匿名
2013-05-23 12:21:38
Division of the construction segment of the main beam based on the lifting capacity of the cantilever construction Basket
  • 匿名
2013-05-23 12:23:18
In accordance with the hanging basket construction boom lift capacity of the main frame construction section of the Division
  • 匿名
2013-05-23 12:24:58
Hangs the basket according to the bracket construction hoisting up ability to carry on the construction stage to the king post the division
  • 匿名
2013-05-23 12:26:38
According to the hanging basket in cantilever construction of lifting capacity on the construction of main girder section dividing
  • 匿名
2013-05-23 12:28:18