当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:If oil based drilling fluid is used, the flow capacity during circulation without cuttings can be more similar between the laboratory and field test of solids control equipment. Again, there is a risk of destructing the real cuttings in the laboratory. Therefore, artificial cuttings have to be used here as well. The co是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If oil based drilling fluid is used, the flow capacity during circulation without cuttings can be more similar between the laboratory and field test of solids control equipment. Again, there is a risk of destructing the real cuttings in the laboratory. Therefore, artificial cuttings have to be used here as well. The co
问题补充:

  • 匿名
2013-05-23 12:21:38
如果使用油基钻井液,无屑流通过程中的流通能力之间的固控设备的实验室和田间试验类似。再次,是自毁在实验室真正扦插的风险。因此,必须用在这里以及人工扦插。后果是提高流量相比,实地评估在实验室的能力。
  • 匿名
2013-05-23 12:23:18
如果油基钻井液用,流量在流通之间没有剪报可以更多类似的实验室和现场测试固体控制设备。 这又是一个风险的真正掘开的毁在了实验室。 因此,必须采用人工切屑在这里。 其结果是提高了流量相比在实验室现场评估。
  • 匿名
2013-05-23 12:24:58
如果油使用基于钻液,流通能力在没有切口的循环期间可以是相似在固体控制设备之间实验室和实地试验。 再次,有自毁真正的切口的风险在实验室里。 所以,必须这里使用人为切口。 后果是被改进的流通能力在实
  • 匿名
2013-05-23 12:26:38
如果使用基于石油钻井液,则无屑循环期间的流量可以更类似之间固控设备的实验室和试验。再次,有风险的破坏在实验室里的真实岩屑。因此,人工岩屑有也用在这里。结果是改进的流量相比现场评价的实验室中。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭