|
关注:1
2013-05-23 12:21
求翻译:在孔口管上接好注浆系统和压力表,先测量钻孔静水压,然后用水桶和秒表测量涌水量。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在孔口管上接好注浆系统和压力表,先测量钻孔静水压,然后用水桶和秒表测量涌水量。
问题补充: |
|
2013-05-23 12:21:38
The orifice tube on the grouting system and pressure gauge, measurement drilling hydrostatic first, and then use the bucket and stopwatch to measure the inflow.
|
|
2013-05-23 12:23:18
In the hole on the tube to good Note jelly system and a pressure gauge, drill holes measure hydrostatic pressure, and then use a stopwatch to measure water bucket and surge of water.
|
|
2013-05-23 12:24:58
Meets the note thick liquid system and the pressure gauge on the manhole tube, surveys the drill hole static hydraulic pressure first, then wells up the water volume with the bucket and the stopwatch survey.
|
|
2013-05-23 12:26:38
In a orifice tube Grouting system and pressure gauges, bored hydrostatic measurement first, and then measuring the water with buckets and a stopwatch.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区