当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:掘进建议采取局部开挖的方法,先用风镐或放小炮的方法开挖顶部、顶部开挖到位后,顶部先用U型钢临时支护,再挖两墙,墙挖到位,安装U型钢腿。U型钢临时支护完成后,再挖中间部分。整个开挖过程,用光面爆破的方法,尽量减少对围岩的震动。最好使用全断面岩石掘进机。掘进段以0.5-0.8m为宜。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
掘进建议采取局部开挖的方法,先用风镐或放小炮的方法开挖顶部、顶部开挖到位后,顶部先用U型钢临时支护,再挖两墙,墙挖到位,安装U型钢腿。U型钢临时支护完成后,再挖中间部分。整个开挖过程,用光面爆破的方法,尽量减少对围岩的震动。最好使用全断面岩石掘进机。掘进段以0.5-0.8m为宜。
问题补充:

  • 匿名
2013-05-23 12:21:38
Boring to recommend a local excavation approach, first picks or excavation at the top put a small gun in place of the top of the excavation, the top of the first u-steel temporary support, and then dig two walls, walls, dug in place, install the u-steel legs. u-steel after the completion of the temp
  • 匿名
2013-05-23 12:23:18
Boring suggested that take partial excavation of the first method, with jackhammers or small guns on the top, and dig dug up top to top, first with steel U temporary support, and dig dug two walls, walls in place, installing U steel legs. Steel U temporary support is complete, then dug middle part.
  • 匿名
2013-05-23 12:24:58
The tunneling suggested adopts excavates the method partially, after uses the air pick first or puts the small artillery the method to excavate the crown, the crown excavates the arriving, the crown uses the U section temporary supports and protections first, then digs two walls, the wall digs the a
  • 匿名
2013-05-23 12:26:38
Driving the local excavation methods are recommended, with a pick or small Cannon top of the excavation, excavating at the top in place, top u-temporary support, to dig two walls, dig the walls in place, install the u-shaped steel legs. U-temporary support is complete, you dig the middle part. Excav
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭